Celebrate 2T/h waste water system installation complete
Congratulations to dongguan Wellsource water treatment co., LTD., for the construction of the 2 tons/hour wastewater treatment engineering installation complete.
The project for suzhou d cloth los coating production workshop wastewater treatment .
Design implementation emission standard for national level 2 (GB9878-1996).
Installing: